MiLAN MIL-RCM16A Dokumentacja Strona 17

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
Przeglądanie stron 16
11921 Slauson Ave. Santa Fe Springs, CA. 90670 (800) 227-4116 FAX (888) 771-7713
17
BLEEDING HYDRAULIC SYSTEM
1. Use UP/DOWN toggle switch to lower the
opened platform to the ground.
2. Loosen, but do not disconnect, the cylinder
line tting from the pressure compensated
ow control valve (FIG. 17-1) on top of
both cylinders.
3. Set the UP/DOWN switch on the RH runner in
the UP position for approximately one second
and then release the switch. Wait ten seconds
and then switch to UP and release. Repeat
this step until there is no air bubbling from the
loosened line ttings.
5. Use UP/DOWN toggle switch to raise and
lower the platform to make sure the Liftgate
operates correctly.
4. Tighten cylinder line tting to pressure
compensated ow control valve (FIG. 17-1).
FIG. 17-1
NOTE: Perform this procedure at a place where Liftgate platform can be
lowered to lowest point of travel. Get a helper to operate Liftgate
control switch.
PRESSURE COMPENSATED
FLOW CONTROL VALVE
CYLINDER LINE FITTING
Przeglądanie stron 16
1 2 ... 12 13 14 15 16 17 18 19 20 21 22 ... 85 86

Komentarze do niniejszej Instrukcji

Brak uwag